Team:
Gerd Schmidt
Michael Zierdt
Duration: 2006-2008
Within the scope of the work, time-related substance loads (filterable substances, o-PO43-, Pges, PP, NO3-) of the Bösen Sieben at the Unterrißdorf gauge and the Lüttchendorf river water treatment plant are determined. This load information is used to analyse and evaluate the efficiency of the river water treatment plant at the mouth of the Bösen Sieben into the Süßen See.